| Improving
People Performance
Energy efficient Fixtures
High
performance glazing for external façade
Extensive
green lush landscaping with water bodies
Mitsubishi
make high elevators and escalators
100%
power back up
Central
air conditioning
|
| Communication
Voice
and data risers: Risers and cable trays provided
Telephone
incomer: Cabling from junction box to tag blocks at each floor
|
HVAC
HVAC
system: Central chiller system with AHUs for common areas
BMS
and controls :System monitoring the principle operations of the
building .Control system fully
integrated with the security ,fire alarm and
lift control systems
Ventilation
and exhaust :provided for toilets, cores and basements . Separate
ventilation for DG
|
Amenities
Structure:
RCC flat slab and column structure with brick /concrete block
positions to clear maximum spans
Escalators:
2 pair of up and down escalators connecting retail floors
Elevators
: 4 nos of passenger elevators exclusive for retail floors
2
nos of separate service elevators for retail
Floor to floor height :Retail floors 4.2 m
|
Security
Video
surveillance :External access points
Car
park areas
Atrium/lobby
Passenger lift cab
Option for connection of camera in tenants lift lobby
Manned security :At all entry ,exit points and patrol as needed
|
Diesel
Generators
Diesel
generator :100% fully automatic backup provided for lighting ,power
&AC
Features:
Automatic Voltage regulator ,PLC based auto starting ,auto load
balancing AMF panel system provided
|
Life
Safety
Wet
riser /hose reels :Located near each staircase
Sprinklers
:Fully Provided in landlord's premises and primary distribution
on each floor .Tap of points available for secondary distribution
Fire
hydrants: Provided at ground level as per design
Hand
held extinguishers :Provided as required
Fire
detection : Main alarm panels, break glass contacts ,smoke and
heat detectors provided .provision of connection for tenants area
to main system
|
Electrical
Electrical
risers : provided
Distribution
boards: Feeds , splitters and panel boards serving tenant from
load side provided ,all wiring till entry of tenants premises
Metering:
Metering split into common loads and tenant loads ,which will
be sub metered
Lightning
protection and earth pits : Lightning pits provided for base building
.Provision for tenants connection to earth pits
Fire
alarm system :Main alarm panel, break glass contacts ,smoke and
heat detectors provided within all
public areas
Emergency
lighting :Emergency lighting fixtures (connected to landlords
UPS)
|